DAR ES SALAAM — Tanzania has switched on the first turbine of a new hydroelectric plant set to double power generation capacity but which has drawn stiff opposition from conservationists because of its location in a UN-designated World Heritage Site. Doto Biteko, energy minister and deputy prime minister, said while visiting the 2,115 megawatt (MW)
↧